水菜丽加勒比av在线播放-国产精品一区二区三区综合-国产精品一区二区久久不-欧美国产精品亚洲精品观看

當(dāng)前位置:首頁-新聞中心新聞中心

淺析通風(fēng)管道翹角及彎頭角度不準(zhǔn)?

發(fā)布人:http://m.hwzxw.net   發(fā)布時(shí)間:2021-07-05 11:45:03

①表現(xiàn):矩形通風(fēng)管道兩相對平面、兩端面不平行;折角不平直;對角線不相等;咬口不嚴(yán)。

① Performance: two relative planes and two end planes of rectangular ventilation duct are not parallel; The angle is not straight; The diagonals are not equal; The bite is not tight.

②影響:會使通風(fēng)管道連接受力不均勻,安裝后的通風(fēng)管道不平直,法蘭盤墊片不嚴(yán)密,系統(tǒng)漏風(fēng),造成空調(diào)負(fù)荷損失,并且縮短使用壽命。

② Influence: it will make the ventilation pipe connection stress uneven, after the installation of the ventilation pipe is not straight, flange gasket is not tight, system air leakage, resulting in air conditioning load loss, and shorten the service life.

                     濟(jì)南通風(fēng)管道

③原因:板下料放樣不準(zhǔn)確;通風(fēng)管道兩兩平行,相對面的板料長度和寬度不相等。

③ Causes: inaccurate setting out of plate cutting; The ventilation pipes are parallel, and the sheet length and width of the opposite side are not equal.

④措施:展開下料時(shí),應(yīng)對板料嚴(yán)格角方,對每片板料的長度、寬度以及檢驗(yàn)對角線,使它們的偏差控制在允許范圍內(nèi);下料后的板料,應(yīng)將通風(fēng)管道相對面的兩片板料重合檢驗(yàn)尺寸準(zhǔn)確性。

④ Measures: when unfolding and blanking, the angle of sheet metal should be strictly square, and the length, width and diagonal of each sheet metal should be inspected to control their deviation within the allowable range; After blanking, two pieces of sheet metal on the opposite side of the ventilation pipe shall be overlapped to check the dimensional accuracy.

以上就是"通風(fēng)管道翹角及彎頭角度不準(zhǔn)的原因"的介紹,希望對大家有所幫助,感謝您的閱讀!

The above is the introduction of "the reason of the ventilation pipe angle and elbow angle is not accurate", hope to help you, thank you for reading!

上一篇:選擇通風(fēng)管道材質(zhì)應(yīng)注意哪些?
下一篇:黑白鐵加工如何來備料?

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

威信县| 孝感市| 宣城市| 通州市| 遂平县| 芦溪县| 安达市| 井陉县| 疏勒县| 金昌市| 南昌市| 北宁市| 溆浦县| 遵化市| 三门峡市| 玛曲县| 松原市| 恩平市| 弥渡县| 读书| 浏阳市| 华亭县| 塘沽区| 饶阳县| 金门县| 信丰县| 宣城市| 沈阳市| 龙胜| 永德县| 定日县| 库车县| 绵阳市| 通州市| 白水县| 潜江市| 靖宇县| 曲靖市| 永春县| 墨脱县| 常山县|