風(fēng)管安裝為什么要采用預(yù)制加工技術(shù)?

發(fā)布人:http://m.hwzxw.net   發(fā)布時(shí)間:2023-04-24 12:01:27

實(shí)際上,在民用建筑工程中,風(fēng)管安裝已經(jīng)普遍采用預(yù)制加工技術(shù),相比以前的現(xiàn)場(chǎng)加工安裝,其優(yōu)勢(shì)多多。這里濟(jì)南風(fēng)管加工廠就來(lái)舉一個(gè)工程示例,來(lái)看一看風(fēng)管預(yù)制加工安裝的施工流程。

In fact, in civil construction projects, prefabricated processing technology has been widely used for the installation of air ducts, which has many advantages compared to previous on-site processing and installation. Here, Jinan Air Pipe Processing Factory will provide an engineering example to take a look at the construction process of prefabrication, processing, and installation of air pipes.

風(fēng)管安裝采用預(yù)制加工技術(shù)優(yōu)勢(shì)多多

There are many advantages of using prefabricated processing technology for air duct installation

不受施工場(chǎng)地的局限:工廠化預(yù)制將大量材料原材料加工任務(wù)搬離了施工現(xiàn)場(chǎng),可以減少加工場(chǎng)地對(duì)現(xiàn)場(chǎng)的占用及依賴。

Not limited by the construction site: Factory prefabrication removes a large amount of material processing tasks from the construction site, which can reduce the occupation and dependence of the processing site on the site.

縮短現(xiàn)場(chǎng)施工工期:工廠化預(yù)制將部分施工任務(wù)搬離了施工現(xiàn)場(chǎng),在現(xiàn)場(chǎng)機(jī)電工作面還沒有的時(shí)候預(yù)制即可提前開始,并且大幅度提高構(gòu)件制造的生產(chǎn)效率。

Shortening the on-site construction period: Factory prefabrication has moved some construction tasks away from the construction site, and prefabrication can start in advance before the on-site mechanical and electrical working surface is available, greatly improving the production efficiency of component manufacturing.

減少材料損耗:在預(yù)制加工,風(fēng)管集中加工,自始終由一個(gè)作業(yè)組負(fù)責(zé)下料,做到“量體取材”,避免了現(xiàn)場(chǎng)材料亂截現(xiàn)、大材小用等現(xiàn)象。

Reduce material loss: In the prefabrication processing center, the air ducts are processed in a centralized manner, and a single operation team is responsible for cutting materials from beginning to end, achieving the goal of "measuring and selecting materials", avoiding phenomena such as random cutting and overuse of materials on site.

20221124691260.png

風(fēng)管預(yù)制加工安裝流程的實(shí)例展示:

Example demonstration of the prefabrication, processing, and installation process of air ducts:

深化設(shè)計(jì)

Deepening design

結(jié)合預(yù)制工作需求,確定預(yù)制件類型,確定預(yù)制標(biāo)準(zhǔn)。通過軟件將BIM模型轉(zhuǎn)換成裝配圖,交付工廠下料加工。

Based on the needs of prefabrication work, determine the type of prefabricated components and determine the prefabrication standards. Convert BIM models into assembly drawings through software and deliver them to the factory for cutting and processing.

場(chǎng)外加工

Off site processing

場(chǎng)外加工根據(jù)拿到料單進(jìn)行預(yù)制工作,進(jìn)行五步流程:

The off-site processing center performs prefabrication work according to the received material list, and carries out a five step process:

排布

Layout

下料

Blanking

滾邊

Rolling edge

裝箱

Packing

出廠

Ex-works

現(xiàn)場(chǎng)施工

On site construction

現(xiàn)場(chǎng)施工流程:

On site construction process:

手持式滾邊機(jī)滾邊

Handheld edge rolling machine edge rolling

碰焊機(jī)焊接法蘭

Butt welding machine welding flange

拼裝好的風(fēng)管

Assembled air duct

三節(jié)風(fēng)管標(biāo)準(zhǔn)節(jié)

Three standard sections of air ducts

水平提升平臺(tái)安裝風(fēng)管

Horizontal lifting platform installation air duct

風(fēng)管安裝為什么要采用預(yù)制加工技術(shù)呢?針對(duì)這個(gè)問題,小編就從講解完畢了,希望能夠給您好的幫助,更多事項(xiàng)就來(lái)我們網(wǎng)站http://m.hwzxw.net咨詢了解吧!

Why should prefabricated processing technology be used for air duct installation? The editor has finished explaining this issue and hopes to provide you with good help. For more information, please come to our website http://m.hwzxw.net Consult and understand!


上一篇:鐵皮風(fēng)管加工的注意事項(xiàng)
下一篇:風(fēng)管加工過程中出現(xiàn)問題怎么避免?

網(wǎng)站首頁(yè) 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

邵阳市| 柞水县| 大城县| 云安县| 四子王旗| 榆树市| 亳州市| 栾川县| 钟祥市| 元江| 杭州市| 长海县| 易门县| 垣曲县| 海阳市| 江达县| 莫力| 柏乡县| 建宁县| 确山县| 临夏县| 阳泉市| 甘南县| 巩义市| 汕头市| 梁平县| 湄潭县| 修文县| 理塘县| 公安县| 河南省| 东阳市| 汾西县| 玛曲县| 高要市| 北宁市| 陆良县| 孙吴县| 晋宁县| 孝义市| 瑞安市|