風(fēng)管加工放樣下料時(shí)的操作事項(xiàng)
發(fā)布人:http://m.hwzxw.net 發(fā)布時(shí)間:2023-05-10 12:07:49
在通風(fēng)風(fēng)管安裝工程中,常會(huì)用到很多類型的風(fēng)管,如:圓弧過渡矩形彎頭、矩管可偏心偏角直角彎頭、矩形變徑雙向三通、矩形變徑四通、矩形等徑M形彎頭等,那么它們在放樣下料時(shí)都需要注意哪些方面的問題呢?下面濟(jì)南風(fēng)管加工廠為您講解一番:
In the installation engineering of ventilation ducts, many types of ducts are often used, such as arc transition rectangular elbows, rectangular ducts with eccentric right angle elbows, rectangular variable diameter two-way tees, rectangular variable diameter four-way joints, rectangular equal diameter M-shaped elbows, etc. What aspects should be paid attention to when laying out and cutting materials? Below, Jinan Air Pipe Processing Factory will explain to you:
風(fēng)管加工放樣下料是制作風(fēng)管的重要環(huán)節(jié)之一,下面是一些操作步驟:
The processing, setting out, and cutting of air ducts are one of the important steps in the production of air ducts. The following are some operational steps:
1.制定放樣圖:根據(jù)設(shè)計(jì)圖紙,繪制放樣圖,標(biāo)出各種風(fēng)管的尺寸、角度和彎曲方向等。
1. Develop a layout plan: Based on the design drawings, draw a layout plan and mark the dimensions, angles, and bending directions of various air ducts.
2.根據(jù)放樣圖進(jìn)行下料:根據(jù)放樣圖上的尺寸、角度等信息,在相應(yīng)的板材上進(jìn)行下料,可以使用手工切割、電動(dòng)剪切機(jī)或激光切割機(jī)等工具。
2. Cutting according to the layout plan: Based on the dimensions, angles, and other information on the layout plan, cutting can be carried out on the corresponding board using tools such as manual cutting, electric shearing machine, or laser cutting machine.
3.加工風(fēng)管:按照放樣圖上的要求將下料的板材進(jìn)行折彎、卷邊等加工,制作成成品風(fēng)管。
3. Processing air duct: According to the requirements on the layout drawing, bend and roll the cut board to produce a finished air duct.
4.檢查質(zhì)量:在加工完成后進(jìn)行質(zhì)量檢查,檢查風(fēng)管的尺寸、角度、彎曲方向、連接件的安裝等是否符合要求。
4. Quality inspection: After the processing is completed, quality inspection is carried out to check whether the size, angle, bending direction, and installation of connectors of the air duct meet the requirements.
展開下料的步驟:展開下料的基本步驟是:熟悉圖形,形體分析,求直線的實(shí)長或平面的實(shí)形,確定展開方法和畫展開圖等。
Steps for unfolding cutting: The basic steps for unfolding cutting include familiarizing oneself with graphics, analyzing shapes, finding the true length of a straight line or the true shape of a plane, determining the unfolding method, and drawing an unfolding diagram.
熟悉圖紙展開下料前,要認(rèn)真熟悉施工圖紙,了解需要展開的管件或部件的內(nèi)容,它在通風(fēng)工程的部位、與何種管件相連接,它在圖紙上尺寸的大小,用哪種材料制作等。對于復(fù)雜的管件和部件需要反復(fù)仔細(xì)地對施工圖進(jìn)行閱讀和分析,必須全部看懂,如果圖紙有錯(cuò)誤或看不懂或設(shè)計(jì)不合理,應(yīng)向有關(guān)部門提出。
Before familiarizing oneself with the construction drawings and cutting materials, one must first carefully familiarize oneself with the construction drawings, understand the content of the pipe fittings or components that need to be unfolded, the location of the ventilation project, the type of pipe fittings connected to it, the size of its dimensions on the drawings, and the type of material used for production. For complex pipe fittings and components, it is necessary to carefully read and analyze the construction drawings repeatedly, and all of them must be understood. If there are any errors or incomprehensible or unreasonable designs in the drawings, they should be reported to the relevant departments.
總之,風(fēng)管加工放樣下料是風(fēng)管制作的關(guān)鍵步驟,需要嚴(yán)格按照設(shè)計(jì)要求進(jìn)行操作,確保風(fēng)管質(zhì)量符合要求。更多相關(guān)內(nèi)容就來我們的網(wǎng)站http://m.hwzxw.net咨詢!
In short, the processing, setting out, and cutting of air ducts are key steps in the production of air ducts, and it is necessary to strictly follow the design requirements to ensure that the quality of the air ducts meets the requirements. For more relevant content, come to our website http://m.hwzxw.net consulting service